At Seabourn, we are passionate about travel.

We believe that traveling for pleasure has a redemptive power that enriches people’s lives.

And we believe that people should travel well.


Cruising on a Seabourn ship is unlike any other form of travel. The experience is luxurious, yet relaxed — elegant, yet casual — sumptuous, yet understated. Our intimate ships visit the most desirable destinations worldwide, sailing to the heart of landmark cities, as well as to hidden gems where larger vessels cannot follow.


Our ships attract interesting people, who seek to share experiences beyond the expected in places beyond the ordinary. Our acclaimed staff offers a unique style of heartfelt hospitality that is sincere, thoughtful and personal.


Seabourn pioneered small-ship, ultra-luxury cruising, and continues to represent the pinnacle of that unique style of travel. Our fleet of intimate, all-suite ships, carrying between 458 and 600 guests each, sail to the world’s most desirable destinations at their peak seasons. On board, guests are served by an award-winning crew numbering nearly as many as the guests, hand-picked and extensively trained to deliver Seabourn’s signature style of thoughtful, personalized and heartfelt hospitality. Seabourn’s ships attract accomplished people who enjoy traveling well, and sharing fun and adventures with other interesting people. A great many of them have found the Seabourn cruise experience to be their preferred method of travel, and return regularly to sail with us again and again. We would welcome the opportunity to explore whether that might be true for you.


In 2009, Seabourn again raised the bar with the debut of Seabourn Odyssey, hailed as “a game-changer for the ultra-luxury segment.” Although larger than the original Seabourn sisters, Seabourn Odyssey carries just 458 guests and offers a wealth of amenities made possible by the highest ratio of space per guest in the cruise industry, including the largest spa on any luxury ship and generous private verandas on 90 percent of her suites. Seabourn Odyssey has since been joined by two identical sisters, Seabourn Sojourn in 2010 and Seabourn Quest in 2011. Our first 600-passenger ship, Seabourn Encore, was delivered in 2016 and a second 600-passenger ship, Seabourn Ovation, was delivered Spring 2018.


Our expanded fleet allows us to offer the award-winning Seabourn experience to more travelers, in more cruising regions than ever before. No matter where in our wide world you want to travel, we offer you the opportunity to see it all in perfect elegance and ease — to travel well — aboard the best small ships in the world.


We would be honored to have you travel with us on your next journey.

The Seabourn All-Inclusive Difference


Hochseeschiffe

Expeditionsschiffe

Die Flotte

Hochseeschiffe

Seabourn Odyssey

(verkauft, nur noch bis August 2024 in der Flotte)


Länge: 198,19 Meter

Breite: 25,60 Meter

Vermessung: 32.346 BRZ

Passagiere: 450 (bei Doppelbelegung)

Passagier-Raum-Quotient: 71,11

Crew: 330

Crew-Passagier-Verhältnis: 1,36

Indienststellung: 2009

Letzte Renovierung: Mai 2019

Werft: T. Mariotti, Genua

Seabourn Sojourn


Länge: 198,19 Meter

Breite: 26,00 Meter

Vermessung: 32.477 BRZ

Passagiere: 450 (bei Doppelbelegung)

Passagier-Raum-Quotient: 72,17

Crew: 330

Crew-Passagier-Verhältnis: 1,36

Indienststellung: 2010

Letzte Renovierung: 2018

Werft: T. Mariotti, Genua

Seabourn Quest


Länge: 198,15 Meter

Breite: 25,60 Meter

Vermessung: 32.477 BRZ

Passagiere: 450 (bei Doppelbelegung)

Passagier-Raum-Quotient: 72,17

Crew: 335

Crew:Passagier-Verhältnis: 1,34

Indienststellung: 2011

Letzte Renovierung: 2016

Werft: T. Mariotti, Genua

Seabourn Encore


Länge: 210,17 Meter

Breite: 27,99 Meter

Vermessung: 41.865 BRZ

Passagiere: 600 (bei Doppelbelegung)

Passagier-Raum-Quotient: 69,78

Crew: 400

Crew-Passagier-Verhältnis: 1,5

Indienststellung: 2016

Letzte Renovierung:

Werft: Fincantieri, Italien

Seabourn Ovation


Länge: 210 Meter

Breite: 28 Meter

Vermessung: 40.350 BRZ

Passagiere: 604 (bei Doppelbelegung)

Passagier-Raum-Quotienten: 66,80

Crew: 418

Crew-Passagier-Verhältnis: 1,44

Indienststellung: 2018

Letzte Renovierung:

Werft: Fincantieri, Italien

Expeditionsschiffe

Seabourn Venture


Länge: 172,32 Meter

Breite: 24,02

Vermessung: 23.615 BRZ

Passagiere: 264 (bei Doppelbelegung)

Passagier-Raum-Quotient: 89,45

Crew: 130

Crew-Passagier-Verhältnis: 2,03

Indienststellung: 2022

Letzte Renovierung:

Werft: T. Mariotti/Cimolai-Gruppe, Italien

Seabourn Pursuit


Länge: 172,32 Meter

Breite: 24,02 Meter

Vermessung: 23.615 BRZ

Passagiere: 264 (bei Doppelbelegung)

Passagier-Raum-Quotient: 89,45

Crew: 120

Crew-Passagier-Verhältnis: 2,2

Indienststellung: 2023

Letzte Renovierung:

Werft: T. Mariotti, Italien

FAQs

  • Do the ships have Wheelchair-accessable Suites?

    Yes, our vessels have specially designed suites for guests who need mobility assistance. If you have not booked one of these accessible suites but instead will be using a standard suite you need to know about some limitations that adversely impact maneuverability, especially ingress and egress. Most entry doors and bathroom doors in non-accessible suites measure 23 inches wide. Bathrooms have a doorsill and the bathtubs are often difficult to negotiate for guests who have limited mobility. Passageways within the suite may be too narrow for a wheelchair or scooter to maneuver throughout the suite.


    Accessible Suites offer features such as wider entry doors to the suite and bathroom measuring a minimum of 32 inches wide, accessible showers with grab bars, benches/seats, and hand-held shower heads as well as lowered closed and towel rods.


    Accessible suite numbers are detailed in the section below by ship and their locations are noted on the deck plans for each ship within the “Onboard Life” section of this website.


    Note: For safety reasons, mobility devices must be stored and charged in the guest’s suite.


    If you are on an Expedition voyage click here for information. If you are on another Seabourn voyage please find the below information applicable to your cruise.


    Seabourn Venture and Seabourn Pursuit

     Suites 825, 824, 800, 738 and 737 have transfer shower configurations.


    Seabourn Encore and Seabourn Ovation

     Suites 1132, 1012, 664, 665, and 550 have transfer shower configurations.

     Suite 1191 has a roll-in shower configuration.


    Seabourn Odyssey, Seabourn Sojourn and Seabourn Quest

     Suite 635 has a transfer shower configuration.

     Suites 913, 813, 815, 619, 619 and 408 have roll-in shower configurations.

  • Is there a dresscode?

    Attire During the Day:


        During the daytime, casual, resort-style attire, including shorts and jeans, is welcome in all lounges and dining venues. Swimsuits, brief shorts, cover-ups and exercise attire should be reserved for poolside, on deck or in the spa and fitness center.


    In the evening (after 6pm) there are two different dress codes:


    Elegant Casual


        Men: Slacks with a collared dress shirt or sweater; Jacket Optional. Ladies: Slacks / skirt, blouse, pant suit or dress. This is the dress standard for all dining venues

        Jeans are welcome in all dining venues during the day, but not appropriate in The Restaurant after 6pm.


    Formal


        In the Restaurant, Men: Tuxedo, suit or slacks and jacket required. Ladies: evening gown or other formal apparel. Dress in other dining venues is Elegant Casual.

        Jeans are welcome in all dining venues during the day, but not appropriate in the Restaurant after 6pm.


    The itinerary in the preliminary document booklet will inform you of the number of Formal evenings to expect during your voyage. As a rule of thumb, Formal evenings are scheduled as follows:


        Cruises up to 13 days: One Formal evening

        Cruises of 14 to 20 days: Two Formal evenings

        Cruises of 21 or more days: Three Formal evenings


    (Note: Extended Explorations, Holiday voyages and crossings may be scheduled differently.)


    Attire Ashore:


    Packing clothing that can be layered is the best way to plan for cruising in virtually any climate. For tropical cruises, bring light, loose-fitting garments that can be paired with a lightweight jacket or sweater. For cooler climates, pack extra layers of warmer garments such as a light top coat and some sweaters. When dressing to go ashore, it is helpful to be aware of the customs of the countries you are visiting. In some ports men and women should not wear shorts. Many cultures prefer that women wear dresses or skirts when visiting shrines, churches, mosques and temples.


    Some of our more adventurous destinations like Alaska and Antarctica voyages have additional special packing requirements.


        Packing for an Alaska Cruise

        Packing for an Arctic or Antarctic Cruise


    Please Note: Firearms, explosives, fireworks, other weapons and knives or sharp blades over 2.5 inches long and illegal drugs of any kind are prohibited without exception.


    Full list of Prohibited Items


    For safety reasons drones and any other remote controlled aerial devices/toys, as well as hoverboards or similar devices are not allowed on board our ships.

  • Are Gratuities included?

    Tipping is neither required nor expected.

  • What if i have food allergies

    For guests with food intolerances or allergies that are not life-threatening, please contact our Reservations Department. For guests with life-threatening food allergies, we ask that guests provide detailed information to Guest Accessibility by completing a Special Requirements Information form (SRI). Guests should indicate on this form which foods may potentially cause a severe reaction.


    Guests with a variety of severe food allergies sail with Seabourn regularly. Our galley staff on board is accustomed to and experienced in dealing with these types of needs. The galley itself has many different areas of food preparation, which can help reduce the possibility of cross-contamination. It is important to note, however, that meals are prepared in open galleys on board the ships, thus there is always the possibility of some cross-contamination. As such, Seabourn cannot guarantee that a guest will not come in contact with those items. Although Guest Accessibility will provide the ship with an advance notice of all food allergies detailed on an SRI submitted to them, it is recommended that guests also contact the Maitre d’ upon boarding to review the details of these special dietary needs.

  • Is smoking allowed?

    For the comfort of all guests, most public areas on board, as well as guest suites, are smoke-free.


    Cigarette smoking is permitted in the following areas:


        Smoking of electronic cigarettes is permitted in guest suites. 


    Outside smoking of cigarettes, cigars and pipes are permitted in designated areas of Seabourn Venture and Seabourn Pursuit:


        The designated smoking area is the starboard half of the Sky Bar open deck.


    Outside smoking of cigarettes is permitted in designated areas of Seabourn Odyssey, Seabourn Sojourn, Seabourn Quest, Seabourn Encore and Seabourn Ovation:


        The designated smoking area for all ships is the starboard half of the Sky Bar open deck.

        Cigarette, cigar & pipe smoking is allowed on the starboard half of the Seabourn Square outside deck.


    Inside smoking of cigarettes is not permitted. Smoking of water-pipes, glass-pipes or other smoking devices is not permitted on board. Smoking is not permitted on open decks during fuel bunkering operations in port. Guests are asked to refrain from smoking anywhere inside the ship, including in guest suites, on verandas and balconies. If you have any doubts about any area, please consult your onboard staff.


    Any guest who smokes inside staterooms or on adjoining verandas in violation of our policy will be charged a US$250 cleaning fee per day of violation.

Hier gelangen Sie direkt zu den aktuellen Angeboten von Seabourn

aktuelle Angebote Seabourn

Bildnachweis: alle Logos, Videos, Fotos: © Seabourn